(!) Since support from Microsoft will end on January 14th, 2020, Windows 7 will be excluded from the recommended environment from December 15th, 2019 on this site. Vì lý do Microsoft kết thúc hỗ trợ cho Windows 7 vào ngày 14/01/2020, Windows 7 sẽ là hệ điều hành không được khuyến khích sử dụng với trang web này từ ngày 15/12/2019.
Select part number to Order Now/ Add to Cart
Caution
thận trọng
[Features]
· THK is a high quality, dedicated LM-shaped linear bushing.
· LM shafts are available with quick delivery.
· Manufactured with shaft diameter tolerance g5, h5 precision grade LM shafts semi-standard.
· LM shafts made from corrosion-resistant martensitic stainless steel are also in production.
[Main Materials]
SUJ2 (High carbon chrome bearing steel)
THK5SP (THK standard material)
Equivalent to SUS440C
[Hardness]58 to 64 HRC (SUJ2, THK5SP), 56 HRC or higher (Equivalent to SUS440C)
[Case Depth]0.8 to 2.5 mm (Depending on the shaft diameter)
[Surface Roughness]Ra0.4 or less
[Straightness of LM Shaft]50 µm/300 mm or less
Part number | Shaft diameter | Production length L | ||
---|---|---|---|---|
d | Tolerance g6 µm | Minimum length | Maximum length | |
SF 3 | 3 | -2 -8 | 20 | 400 |
SF 4 | 4 | -4 -12 | 20 | 400 |
SF 5 | 5 | 20 | 500 | |
SF 6 | 6 | 20 | 1,500 | |
SF 8 | 8 | -5 -14 | 20 | 1,500 |
SF 10 | 10 | 30 | 1,500 | |
SF 12 | 12 | -6 -17 | 30 | 1,500 |
SF 13 | 13 | 30 | 1,500 | |
SF 16 | 16 | 40 | 3,000 | |
SF 20 | 20 | -7 -20 | 40 | 3,000 |
SF 25 | 25 | 50 | 3,000 | |
SF 30 | 30 | 60 | 3,000 | |
SF 35 | 35 | -9 -25 | 70 | 3,000 |
SF 38 | 38 | 100 | 3,000 | |
SF 40 | 40 | 100 | 3,000 | |
SF 50 | 50 | 100 | 3,000 | |
SF 60 | 60 | -10 -29 | 200 | 3,000 |
SF 80 | 80 | 200 | 3,000 | |
SF 100 | 100 | -12 -34 | 200 | 3,000 |
Part Number |
---|
SF3(G6)-[70-400/1]L |
SF4(G6)-[70-400/1]L |
SF5(G6)-[70-400/1]L |
SF5(G6)-[70-400/1]LM |
SF6(G6)X2-[70-600/1]L |
SF6(G6)X2-[70-600/1]LK |
SF6(G6)-[70-600/1]L |
SF6(G6)-[70-600/1]LK |
SF6(G6)-[70-600/1]LM |
SF8(G6)X3-[70-800/1]L |
SF8(G6)X3-[70-800/1]LK |
SF8(G6)-[70-800/1]L |
SF8(G6)-[70-800/1]LK |
SF10(G6)X4-[70-800/1]L |
SF10(G6)X4-[70-800/1]LK |
SF10(G6)-[70-800/1]L |
SF10(G6)-[70-800/1]LK |
SF12(G6)X6-[70-1000/1]L |
SF12(G6)X6-[70-1000/1]LK |
SF12(G6)-[70-1000/1]L |
SF12(G6)-[70-1000/1]LK |
SF12(G6)-[70-1000/1]LM |
SF13(G6)X7-[70-1000/1]L |
SF13(G6)X7-[70-1000/1]LK |
SF13(G6)-[70-1000/1]L |
SF13(G6)-[70-1000/1]LK |
SF13(G6)-[70-1000/1]LM |
SF16(G6)-[100-1200/1]LM |
SF20(G6)-[100-1200/1]L |
SF20(G6)-[100-1200/1]LK |
SF20(G6)X[10,14]-[100-1200/1]L |
SF20(G6)X[10,14]-[100-1200/1]LK |
SF25(G6)X15-[100-1200/1]L |
SF25(G6)X15-[100-1200/1]LK |
SF25(G6)-[100-1200/1]L |
SF25(G6)-[100-1200/1]LK |
SF25(G6)-[100-1200/1]LM |
SF30(G6)X16-[100-1500/1]L |
SF30(G6)X16-[100-1500/1]LK |
SF30(G6)-[100-1500/1]L |
SF30(G6)-[100-1500/1]LK |
SF35(G6)X20-[100-1500/1]L |
SF35(G6)X20-[100-1500/1]LK |
SF35(G6)-[100-1500/1]L |
SF35(G6)-[100-1500/1]LK |
SF35(G6)-[100-1500/1]LM |
SF40(G6)X22-[100-2000/1]L |
SF40(G6)X22-[100-2000/1]LK |
SF40(G6)-[100-2000/1]L |
SF40(G6)-[100-2000/1]LK |
SF40(G6)-[100-2000/1]LM |
SF50(G6)X25-[100-2000/1]L |
SF50(G6)X25-[100-2000/1]LK |
SF50(G6)-[100-2000/1]L |
SF50(G6)-[100-2000/1]LK |
SF50(G6)-[100-2000/1]LM |
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to ShipSố ngày giao hàng | Basic Shape | Material | Shaft Dia. D (Ø) | Length L (mm) | Shaft fits | Material | Heat Treatment | Pipe inner diameter |
---|---|---|---|---|---|---|---|---|---|---|---|---|
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 3 | 70 ~ 400 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 4 | 70 ~ 400 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 5 | 70 ~ 400 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | Stainless Steel | 5 | 70 ~ 400 | g6 | - | HRC58 to 64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 6 | 70 ~ 600 | g6 | SUJ2 | HRC58~64 | 2 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 6 | 70 ~ 600 | g6 | SUJ2 | HRC58~64 | 2 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 6 | 70 ~ 600 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 6 | 70 ~ 600 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | Stainless Steel | 6 | 70 ~ 600 | g6 | - | HRC58 to 64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 8 | 70 ~ 800 | g6 | SUJ2 | HRC58~64 | 3 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 8 | 70 ~ 800 | g6 | SUJ2 | HRC58~64 | 3 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 8 | 70 ~ 800 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 8 | 70 ~ 800 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 10 | 70 ~ 800 | g6 | SUJ2 | HRC58~64 | 4 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 10 | 70 ~ 800 | g6 | SUJ2 | HRC58~64 | 4 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 10 | 70 ~ 800 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 10 | 70 ~ 800 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 12 | 70 ~ 1000 | g6 | SUJ2 | HRC58~64 | 6 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 12 | 70 ~ 1000 | g6 | SUJ2 | HRC58~64 | 6 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 12 | 70 ~ 1000 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 12 | 70 ~ 1000 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | Stainless Steel | 12 | 70 ~ 1000 | g6 | - | HRC58 to 64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 13 | 70 ~ 1000 | g6 | SUJ2 | HRC58~64 | 7 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 13 | 70 ~ 1000 | g6 | SUJ2 | HRC58~64 | 7 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 13 | 70 ~ 1000 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 13 | 70 ~ 1000 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | Stainless Steel | 13 | 70 ~ 1000 | g6 | - | HRC58 to 64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | Stainless Steel | 16 | 100 ~ 1200 | g6 | - | HRC58 to 64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 20 | 100 ~ 1200 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 20 | 100 ~ 1200 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 20 | 100 ~ 1200 | g6 | SUJ2 | HRC58~64 | 10 ~ 14 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 20 | 100 ~ 1200 | g6 | SUJ2 | HRC58~64 | 10 ~ 14 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 25 | 100 ~ 1200 | g6 | SUJ2 | HRC58~64 | 15 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 25 | 100 ~ 1200 | g6 | SUJ2 | HRC58~64 | 15 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 25 | 100 ~ 1200 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 25 | 100 ~ 1200 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | Stainless Steel | 25 | 100 ~ 1200 | g6 | - | HRC58 to 64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 30 | 100 ~ 1500 | g6 | SUJ2 | HRC58~64 | 16 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 30 | 100 ~ 1500 | g6 | SUJ2 | HRC58~64 | 16 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 30 | 100 ~ 1500 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 30 | 100 ~ 1500 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 35 | 100 ~ 1500 | g6 | SUJ2 | HRC58~64 | 20 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 35 | 100 ~ 1500 | g6 | SUJ2 | HRC58~64 | 20 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 35 | 100 ~ 1500 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 35 | 100 ~ 1500 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | Stainless Steel | 35 | 100 ~ 1500 | g6 | - | HRC58 to 64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 40 | 100 ~ 2000 | g6 | SUJ2 | HRC58~64 | 22 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 40 | 100 ~ 2000 | g6 | SUJ2 | HRC58~64 | 22 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 40 | 100 ~ 2000 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 40 | 100 ~ 2000 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | Stainless Steel | 40 | 100 ~ 2000 | g6 | - | HRC58 to 64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 50 | 100 ~ 2000 | g6 | SUJ2 | HRC58~64 | 25 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 50 | 100 ~ 2000 | g6 | SUJ2 | HRC58~64 | 25 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | SUJ2 | 50 | 100 ~ 2000 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Pipe | SUJ2 | 50 | 100 ~ 2000 | g6 | SUJ2 | HRC58~64 | 0 | ||
- | 1 Piece(s) | 18 Day(s) or more | Straight | Stainless Steel | 50 | 100 ~ 2000 | g6 | - | HRC58 to 64 | 0 |
Loading...Tải…
End Shape (Left) | No Machining | End Shape (Right) | No Machining | Heat Treatment | Induction hardened |
---|---|---|---|---|---|
Surface Treatment | No |
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy