(!) Since support from Microsoft will end on January 14th, 2020, Windows 7 will be excluded from the recommended environment from December 15th, 2019 on this site. Vì lý do Microsoft kết thúc hỗ trợ cho Windows 7 vào ngày 14/01/2020, Windows 7 sẽ là hệ điều hành không được khuyến khích sử dụng với trang web này từ ngày 15/12/2019.
Select part number to Order Now/ Add to Cart
Caution
thận trọng
A plumbing fitting that uses a screw connection for steel pipes with small to medium diameters; JIS B 2301 specifies it as "screwed type malleable cast iron pipe fitting". Hot zinc plating reduces environmental burden.
Connecting Shape | Elbow | Connection Type | Screw⇔Screw Different Diameter | Material | FCMB27-05 |
---|---|---|---|---|---|
Connection Thread Type M1 | Rc | Connection Thread Type M2 | Rc | Applicable Fluid | Water / Air / Steam / Gas / Oil |
Type | Fitting | Max. Operating Pressure(MPa) | 2.5 | Divisions of Max. Operating Pressure | than 2.0Mpa |
Interior Resin Lining | No |
Please check the type/dimensions/specifications of the part BRL-80X25A-W in the Pipe Fitting, Reducing Elbow series.Vui lòng kiểm tra kiểu/kích thước/thông số kỹ thuật của phần BRL-80X25A-W trong chuỗi Pipe Fitting, Reducing Elbow.
Part Number |
---|
BRL-100X50A-W |
BRL-100X65A-W |
BRL-100X80A-B |
BRL-80X32A-W |
BRL-80X50A-B |
BRL-80X50A-W |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to ShipSố ngày giao hàng | Nominal of Thread M1 | Nominal of Thread M2 | Surface Treatment | Band |
---|---|---|---|---|---|---|---|---|
2,456,115 VND | 1 Piece(s) | 8 Day(s) or more | 4B(100A) | 2B(50A) | [Zinc Plating] Hot zinc plating | Presence | ||
2,146,550 VND | 1 Piece(s) | 8 Day(s) or more | 4B(100A) | 2 1/2B(65A) | [Zinc Plating] Hot zinc plating | Presence | ||
2,016,346 VND | 4 Piece(s) | 6 Day(s) or more | 4B(100A) | 3B(80A) | [Not Provided] No | Presence | ||
1,369,325 VND | 1 Piece(s) | 6 Day(s) or more | 3B(80A) | 1 1/4B(32A) | [Zinc Plating] Hot zinc plating | Presence | ||
1,189,241 VND | 1 Piece(s) | 6 Day(s) or more | 3B(80A) | 2B(50A) | [Not Provided] No | Presence | ||
1,263,666 VND | 1 Piece(s) | 8 Day(s) or more | 3B(80A) | 2B(50A) | [Zinc Plating] Hot zinc plating | Presence |
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy