(!) Since support from Microsoft will end on January 14th, 2020, Windows 7 will be excluded from the recommended environment from December 15th, 2019 on this site. Vì lý do Microsoft kết thúc hỗ trợ cho Windows 7 vào ngày 14/01/2020, Windows 7 sẽ là hệ điều hành không được khuyến khích sử dụng với trang web này từ ngày 15/12/2019.
Select part number to Order Now/ Add to Cart
Spiral tap for blind hole machining with extremely viscous or work-hardened work material.
[Features]
· For blind hole machining with extremely viscous or work-hardened work materials such as chrome steel, molybdenum steel, and stainless steel.
· Optimal design of the screw part reduces the machining burden on each blade bite, reducing the cutting resistance and increasing tool life.
· Stable scrap is ejected and a good finish is realized.
· Capable of machining both synchronously and asynchronously.
· Machining speed of 10 m/min or less is recommended.
[Applications]
Optimal for machining extremely viscous or work-hardened work material.
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to ShipSố ngày giao hàng | Screw Types | Nominal | Pitch, Number of Threading (mm) | Overall Length (L) (mm) | Class | Thread Length (mm) | Length under neck (mm) | Shank diameter (Ds) (mm) | Shank square width (K) (mm) | Shank square part length (mm) | Number of Grooves | Shape | Surface Treatment | Torsional Angle |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
722,435 VND | 1 Piece(s) | 9 Day(s) or more | Meter | M1.4 | 0.3 | 36 | P1 | 5.4 | - | 3 | 2.5 | 5 | 2 | a | Oxidation treatment | 45° | ||
675,520 VND | 1 Piece(s) | 8 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
690,960 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M1.7 | 0.35 | 36 | P1 | 6.3 | - | 3 | 2.5 | 5 | 2 | b | Oxidation treatment | 45° | ||
593,435 VND | 1 Piece(s) | 8 Day(s) or more | unified | No.2 | 56 | 42 | P1 | 8.1 | 12 | 3 | 2.5 | 5 | 2 | c | Oxidation treatment | - | ||
499,323 VND | 1 Piece(s) | 8 Day(s) or more | unified | No.3 | 48 | 46 | P1 | 8.1 | 14 | 3 | 2.5 | 5 | 2 | c | Oxidation treatment | - | ||
390,160 VND | 1 Piece(s) | 8 Day(s) or more | unified | No.4 | 48 | 46 | P1 | 9 | 14 | 4 | 3.2 | 6 | 2 | c | Oxidation treatment | - | ||
390,160 VND | 1 Piece(s) | 8 Day(s) or more | unified | No.4 | 40 | 46 | P1 | 9 | 14 | 4 | 3.2 | 6 | 2 | c | Oxidation treatment | - | ||
367,051 VND | 1 Piece(s) | 8 Day(s) or more | unified | No.5 | 44 | 52 | P1 | 11 | 16 | 5 | 4 | 7 | 3 | c | Oxidation treatment | - | ||
367,051 VND | 1 Piece(s) | 8 Day(s) or more | unified | No.5 | 40 | 52 | P1 | 11 | 16 | 5 | 4 | 7 | 3 | c | Oxidation treatment | - | ||
367,051 VND | 1 Piece(s) | 9 Day(s) or more | unified | No.6 | 40 | 52 | P1 | 11 | 16 | 5 | 4 | 7 | 3 | c | Oxidation treatment | - | ||
694,945 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M10 | 1 | 75 | P2 | 23 | - | 7 | 5.5 | 8 | 3 | e | Oxidation treatment | 50° | ||
438,487 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M10 | 1.25 | 75 | P2 | 23 | - | 7 | 5.5 | 8 | 3 | e | Oxidation treatment | 50° | ||
389,150 VND | 1 Piece(s) | 6 Day(s) or more | Meter | M10 | 1.5 | 75 | P2 | 23 | - | 7 | 5.5 | 8 | 3 | e | Oxidation treatment | 50° | ||
884,275 VND | 1 Piece(s) | 9 Day(s) | Meter | M12 | 1 | 82 | P2 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | Oxidation treatment | 50° | ||
634,386 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M12 | 1.25 | 82 | P2 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | Oxidation treatment | 50° | ||
634,386 VND | 1 Piece(s) | 9 Day(s) | Meter | M12 | 1.5 | 82 | P2 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | Oxidation treatment | 50° | ||
550,042 VND | 1 Piece(s) | 5 Day(s) | Meter | M12 | 1.75 | 82 | P2 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | Oxidation treatment | 50° | ||
1,277,823 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M14 | 1 | 88 | P2 | 26 | - | 10.5 | 8 | 11 | 3 | e | Oxidation treatment | 50° | ||
852,318 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M14 | 1.5 | 88 | P2 | 26 | - | 10.5 | 8 | 11 | 3 | e | Oxidation treatment | 50° | ||
852,318 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M14 | 2 | 88 | P2 | 26 | - | 10.5 | 8 | 11 | 3 | e | Oxidation treatment | 50° | ||
1,124,833 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M16 | 1.5 | 95 | P2 | 26 | - | 12.5 | 10 | 13 | 3 | e | Oxidation treatment | 50° | ||
1,002,617 VND | 1 Piece(s) | 6 Day(s) or more | Meter | M16 | 2 | 95 | P2 | 26 | - | 12.5 | 10 | 13 | 3 | e | Oxidation treatment | 50° | ||
1,499,423 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M18 | 1.5 | 100 | P2 | 33 | - | 14 | 11 | 14 | 4 | e | Oxidation treatment | 50° | ||
690,960 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M1.7 | 0.35 | 36 | P2 | 6.3 | - | 3 | 2.5 | 5 | 2 | b | Oxidation treatment | 45° | ||
414,094 VND | 1 Piece(s) | 6 Day(s) or more | Meter | M6 | 0.75 | 62 | P2 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | Oxidation treatment | 50° | ||
605,785 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M8 | 0.75 | 70 | P2 | 19 | - | 6.2 | 5 | 8 | 3 | e | Oxidation treatment | 50° | ||
501,438 VND | 1 Piece(s) | 6 Day(s) or more | Meter | M8 | 1 | 70 | P2 | 19 | - | 6.2 | 5 | 8 | 3 | e | Oxidation treatment | 50° | ||
306,733 VND | 1 Piece(s) | 6 Day(s) or more | Meter | M8 | 1.25 | 70 | P2 | 19 | - | 6.2 | 5 | 8 | 3 | e | Oxidation treatment | 50° | ||
396,533 VND | 1 Piece(s) | 8 Day(s) or more | unified | 1/4 | 28 | 62 | P2 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | Oxidation treatment | - | ||
373,510 VND | 1 Piece(s) | 8 Day(s) or more | unified | 1/4 | 20 | 62 | P2 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | Oxidation treatment | - | ||
537,173 VND | 1 Piece(s) | 8 Day(s) or more | unified | 5/16 | 24 | 70 | P2 | 19 | - | 6.2 | 5 | 8 | 3 | e | Oxidation treatment | - | ||
509,700 VND | 1 Piece(s) | 9 Day(s) or more | unified | 5/16 | 18 | 70 | P2 | 19 | - | 6.2 | 5 | 8 | 3 | e | Oxidation treatment | - | ||
678,211 VND | 1 Piece(s) | 8 Day(s) or more | unified | 3/8 | 24 | 75 | P2 | 23 | - | 7 | 5.5 | 8 | 3 | e | Oxidation treatment | - | ||
678,211 VND | 1 Piece(s) | 8 Day(s) or more | unified | 3/8 | 16 | 75 | P2 | 23 | - | 7 | 5.5 | 8 | 3 | e | Oxidation treatment | - | ||
850,516 VND | 1 Piece(s) | 8 Day(s) or more | unified | 7/16 | 20 | 82 | P2 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | Oxidation treatment | - | ||
995,745 VND | 1 Piece(s) | 8 Day(s) or more | unified | 1/2 | 20 | 88 | P2 | 26 | - | 10.5 | 8 | 11 | 3 | e | Oxidation treatment | - | ||
1,465,076 VND | 1 Piece(s) | 8 Day(s) or more | unified | 5/8 | 18 | 95 | P2 | 26 | - | 12.5 | 10 | 13 | 3 | e | Oxidation treatment | - | ||
367,051 VND | 1 Piece(s) | 8 Day(s) or more | unified | No.6 | 32 | 52 | P2 | 11 | 16 | 5 | 4 | 7 | 3 | c | Oxidation treatment | - | ||
375,416 VND | 1 Piece(s) | 8 Day(s) or more | unified | No.8 | 36 | 60 | P2 | 13 | 21 | 5.5 | 4.5 | 7 | 3 | c | Oxidation treatment | - | ||
343,865 VND | 1 Piece(s) | 8 Day(s) or more | unified | No.8 | 32 | 60 | P2 | 13 | 21 | 5.5 | 4.5 | 7 | 3 | c | Oxidation treatment | - | ||
385,066 VND | 1 Piece(s) | 8 Day(s) or more | unified | No.10 | 32 | 60 | P2 | 13 | 22 | 5.5 | 4.5 | 7 | 3 | c | Oxidation treatment | - | ||
385,066 VND | 1 Piece(s) | 8 Day(s) or more | unified | No.10 | 24 | 60 | P2 | 13 | 22 | 5.5 | 4.5 | 7 | 3 | c | Oxidation treatment | - | ||
369,043 VND | 1 Piece(s) | 8 Day(s) or more | Whitworth | 3/16 | 24 | 60 | P2 | 13 | 21 | 5.5 | 4.5 | 7 | 3 | c | Oxidation treatment | - | ||
401,798 VND | 1 Piece(s) | 8 Day(s) or more | Whitworth | 1/4 | 20 | 62 | P2 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | Oxidation treatment | - | ||
537,173 VND | 1 Piece(s) | 8 Day(s) or more | Whitworth | 5/16 | 18 | 70 | P2 | 19 | - | 6.2 | 5 | 8 | 3 | e | Oxidation treatment | - | ||
678,211 VND | 1 Piece(s) | 8 Day(s) or more | Whitworth | 3/8 | 16 | 75 | P2 | 23 | - | 7 | 5.5 | 8 | 3 | e | Oxidation treatment | - | ||
592,155 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M10 | 1.25 | 75 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | Oxidation treatment | 50° | ||
541,556 VND | 1 Piece(s) | 10 Day(s) or more | Meter | M10 | 1.5 | 75 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | Oxidation treatment | 50° | ||
821,241 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M12 | 1.25 | 82 | P3 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | Oxidation treatment | 50° | ||
821,241 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M12 | 1.5 | 82 | P3 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | Oxidation treatment | 50° | ||
750,325 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M12 | 1.75 | 82 | P3 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | Oxidation treatment | 50° | ||
1,107,301 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M14 | 2 | 88 | P3 | 26 | - | 10.5 | 8 | 11 | 3 | e | Oxidation treatment | 50° | ||
1,465,076 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M16 | 2 | 95 | P3 | 26 | - | 12.5 | 10 | 13 | 3 | e | Oxidation treatment | 50° | ||
1,489,778 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M18 | 2.5 | 100 | P3 | 33 | - | 14 | 11 | 14 | 4 | e | Oxidation treatment | 50° | ||
2,024,846 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M20 | 1.5 | 105 | P3 | 33 | - | 15 | 12 | 15 | 4 | e | Oxidation treatment | 50° | ||
2,034,493 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M20 | 2.5 | 105 | P3 | 33 | - | 15 | 12 | 15 | 4 | e | Oxidation treatment | 50° | ||
3,362,318 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M22 | 1.5 | 115 | P3 | 33 | - | 17 | 13 | 16 | 4 | e | Oxidation treatment | 50° | ||
2,385,028 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M22 | 2.5 | 115 | P3 | 33 | - | 17 | 13 | 16 | 4 | e | Oxidation treatment | 50° | ||
4,183,050 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M24 | 1.5 | 120 | P3 | 39 | - | 19 | 15 | 18 | 4 | e | Oxidation treatment | 50° | ||
3,847,661 VND | 1 Piece(s) | 8 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
3,193,790 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M24 | 3 | 120 | P3 | 39 | - | 19 | 15 | 18 | 4 | e | Oxidation treatment | 50° | ||
5,907,778 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M27 | 1.5 | 130 | P3 | 39 | - | 20 | 15 | 18 | 4 | e | Oxidation treatment | 50° | ||
5,527,229 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M27 | 3 | 130 | P3 | 39 | - | 20 | 15 | 18 | 4 | e | Oxidation treatment | 50° | ||
7,527,723 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M30 | 1.5 | 135 | P3 | 46 | - | 23 | 17 | 20 | 4 | e | Oxidation treatment | 50° | ||
12,874,101 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M42 | 1.5 | 175 | P3 | 27 | - | 32 | 26 | 30 | 4 | 5 | Oxide Treatment | - | ||
432,790 VND | 1 Piece(s) | 6 Day(s) or more | Meter | M8 | 1.25 | 70 | P3 | 19 | - | 6.2 | 5 | 8 | 3 | e | Oxidation treatment | 50° | ||
939,171 VND | 1 Piece(s) | 8 Day(s) or more | unified | 7/16 | 14 | 82 | P3 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | Oxidation treatment | - | ||
995,745 VND | 1 Piece(s) | 8 Day(s) or more | unified | 1/2 | 13 | 88 | P3 | 26 | - | 10.5 | 8 | 11 | 3 | e | Oxidation treatment | - | ||
1,465,076 VND | 1 Piece(s) | 8 Day(s) or more | unified | 5/8 | 11 | 95 | P3 | 26 | - | 12.5 | 10 | 13 | 3 | e | Oxidation treatment | - | ||
2,647,168 VND | 1 Piece(s) | 8 Day(s) or more | unified | 3/4 | 16 | 105 | P3 | 33 | - | 15 | 12 | 15 | 4 | e | Oxidation treatment | - | ||
2,647,168 VND | 1 Piece(s) | 8 Day(s) or more | unified | 3/4 | 10 | 105 | P3 | 33 | - | 15 | 12 | 15 | 4 | e | Oxidation treatment | - | ||
3,698,976 VND | 1 Piece(s) | 8 Day(s) or more | unified | 7/8 | 14 | 115 | P3 | 33 | - | 17 | 13 | 16 | 4 | e | Oxidation treatment | - | ||
3,698,976 VND | 1 Piece(s) | 9 Day(s) or more | unified | 7/8 | 9 | 115 | P3 | 33 | - | 17 | 13 | 16 | 4 | e | Oxidation treatment | - | ||
5,487,051 VND | 1 Piece(s) | 8 Day(s) or more | unified | 1 | 12 | 125 | P3 | 39 | - | 19 | 15 | 18 | 4 | e | Oxidation treatment | - | ||
5,133,397 VND | 1 Piece(s) | 9 Day(s) | unified | 1 | 8 | 125 | P3 | 39 | - | 19 | 15 | 18 | 4 | e | Oxidation treatment | - | ||
789,632 VND | 1 Piece(s) | 9 Day(s) or more | Whitworth | 7/16 | 14 | 82 | P3 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | Oxidation treatment | - | ||
995,745 VND | 1 Piece(s) | 8 Day(s) or more | Whitworth | 1/2 | 12 | 88 | P3 | 26 | - | 10.5 | 8 | 11 | 3 | e | Oxidation treatment | - | ||
1,349,496 VND | 1 Piece(s) | 8 Day(s) or more | Whitworth | 9/16 | 12 | 95 | P3 | 26 | - | 12.5 | 10 | 13 | 3 | e | Oxidation treatment | - | ||
1,456,708 VND | 1 Piece(s) | 8 Day(s) or more | Whitworth | 5/8 | 11 | 95 | P3 | 26 | - | 12.5 | 10 | 13 | 3 | e | Oxidation treatment | - | ||
3,394,986 VND | 1 Piece(s) | 8 Day(s) or more | Whitworth | 7/8 | 9 | 115 | P3 | 33 | - | 17 | 13 | 16 | 4 | e | Oxidation treatment | - | ||
4,870,776 VND | 1 Piece(s) | 9 Day(s) or more | Whitworth | 1 | 8 | 125 | P3 | 39 | - | 19 | 15 | 18 | 4 | e | Oxidation treatment | - | ||
694,945 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M10 | 1 | 75 | P4 | 23 | - | 7 | 5.5 | 8 | 3 | e | Oxidation treatment | 50° | ||
537,437 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M10 | 1.25 | 75 | P4 | 23 | - | 7 | 5.5 | 8 | 3 | e | Oxidation treatment | 50° | ||
592,155 VND | 1 Piece(s) | 9 Day(s) or more | Meter | M10 | 1.5 | 75 | P4 | 23 | - | 7 | 5.5 | 8 | 3 | e | Oxidation treatment | 50° | ||
821,241 VND | 1 Piece(s) | 9 Day(s) or more | Meter | M12 | 1.5 | 82 | P4 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | Oxidation treatment | 50° | ||
821,241 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M12 | 1.75 | 82 | P4 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | Oxidation treatment | 50° | ||
1,107,301 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M14 | 1.5 | 88 | P4 | 26 | - | 10.5 | 8 | 11 | 3 | e | Oxidation treatment | 50° | ||
1,107,301 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M14 | 2 | 88 | P4 | 26 | - | 10.5 | 8 | 11 | 3 | e | Oxidation treatment | 50° | ||
1,465,076 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M16 | 1.5 | 95 | P4 | 26 | - | 12.5 | 10 | 13 | 3 | e | Oxidation treatment | 50° | ||
1,465,076 VND | 1 Piece(s) | 8 Day(s) or more | Meter | M16 | 2 | 95 | P4 | 26 | - | 12.5 | 10 | 13 | 3 | e | Oxidation treatment | 50° |
Loading...Tải…
Chamfer threads | 2.5P | Tool Material Type | High-speed steel | work material | High Carbon Steel (C with a content over 0.45%) / Alloy Steel (SCM) / Stainless steel (SUS) |
---|---|---|---|---|---|
Tap Type | Spiral Tap | Hole type | For blind hole | Coating Y/N | NA |
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy